Schematic Design and Pre-Conceptual work is the first attempt to define the project and
establish the relationship between engineering and compliance...

The URS gets developed in this phase bys the Engineering Team...

How does it get to the Compliance Team and into the Compliance documents?...
Comments or feedback regarding this website? contact webmaster@gmpcompliancebasis.com
Copyright 2004-08
Industry Links
Compliance Basis
Information Flow...during Engineering
GMP
GMP Compliance Basis
GMP CB Blog
cGMP Compliance...How information gets around...
Regulated Facilities
and Processes
Engineering
Project Management
Commissioning
Qualification
How does information move from the Engineering Team to the Compliance Team?...
Take our Industry Survey
Home
Operating System Description
Checklists
Tools
Contact GMP CB
GMP Compliance
Basis Blog
Click here
Q8 Design Space
"V" Model
All Rights Reserved
Future
Legal Disclaimer
About GMP CB
Home
Schematic Design
Our advertisers
Page Links
Explanation
OS - Engineering
OS - Validation
OS - Construction
Click on the image at left for a diagram
describing infromation flow from Project
Definition Phase to GMP Documentation, i. e.
Commissioning Plan and Qualification Plan...
Follow-Up...
Need diagrams for other phases of engineering effort...

Need specific examples of information to be included in GMP plans at each phase...
Preliminary Design
Preliminary Engineering follows the Schematic phase and the next efforts to develop more
detail for the project scope...
Click on the image at left for a diagram
describing infromation flow from Preliminary
Engineering Phase to GMP Documentation...
Final Design
Final Engineering completes the documentation for the detailed project requirements and
specifications and supports the procurement and subcontract efforts during construction...
Click on the image at left for a diagram
describing infromation flow from Final
Engineering Phase to GMP Documentation...