| GMP Gowning Regimen | ||||
| Classification |
Description |
Examples |
Gowning |
Remarks |
| G 0 |
Street clothes |
Mechanical Room Electrical Room Storage Rooms Process Grey Space |
No requirements |
Access to unclassified and non-controlled spaces only |
| G 1 |
Plant Uniform |
Warehouse Loading Dock Storage Rooms |
Safety Shoes |
|
| G 2 |
Process Gown |
Wash areas Secondary Packaging |
Hairnet/ Beard Cover Labcoat over Plant Uniform Booties over plant shoes |
may use dedicated shoes in lieu of booties |
| G 4 |
Process Gown |
Media/ Buffer Prep Primary Processing Fermentation |
Hairnet/ Beard Cover Process Gown over Plant Uniform Tyvek shoecovers over plant shoes Gloves |
|
| G 5 |
Process Gown- Aseptic |
Aseptic Filling |
Hairnet/ Beard Cover Process Gown with full headcover over Plant Uniform Tyvek shoecovers over plant shoes Goggles or face mask Gloves |
No exposed skin Sterile gowning protocol includes pre-gowning |
| G 6 |
Process Gown- Laboratory |
Quality Control
Labs Microbiology Labs |
Lab Coat over street clothes or Plant Uniform |
Classified lab areas may require G 2 gowning |
| G 7 |
Special |
TBD |
TBD |
TBD |
| Comments or
feedback regarding this website? contact webmaster@gmpcompliancebasis.com |

| Compliance
Basis |
| Checklists |
| GMP |
| GMP Compliance
Basis |
| cGMP
Compliance...by the Lists... |
| Checklists and
Tools |
| GMP Compliance Basis Blog Click here |
| Space
Classification System |
| Our advertisers |
| Page Links |
| GMP Process Space | ||||
| Classification |
Description |
Examples |
Finishes |
Remarks |
| Class 1 |
Support/ Utility |
Mechanical Room Electrical Room Storage Rooms Process Grey Space |
Floor- Sealed Concrete Walls- Epoxy Paint over CMU/ GWM/ Ext Siding Base- none Ceiling- Exposed Structure Other- |
Upgrade floors to epoxy paint/
seamless epoxy May be rated walls |
| Class 2 |
Material Handling |
Warehouse Loading Dock Storage Rooms |
Floor- Walls- Base- Ceiling- Other- |
Same as Class 1 space noted above Upgrades same as Class 1 noted above |
| Class 3-CNC |
Process- CNC |
Secondary Packaging |
Floor- Sheet vinyl Walls- GWB w/ epoxy paint Base- Vinyl cove base Ceiling- AC tile Other- n/a |
|
| Class 3-D |
Process- Class D |
Media/ Buffer Prep Solid Dosage |
Floor- Seamless epoxy Walls- GWB w/ epoxy paint Base- Epoxy cove base Ceiling- CR AC tile Other- n/a |
|
| Class 3-C |
Process- Class C |
Primary
Processing Fermentation |
Floor- Seamless epoxy Walls- GWB w/ epoxy paint Base- Epoxy cove base Ceiling- GWB w/ epoxy paint Other- n/a |
|
| Class 3-B |
Process- Class B |
Primary
Processing Purification |
Floor- Seamless epoxy Walls- GWB w/ epoxy paint Base- Epoxy cove base Ceiling- GWB w/ epoxy paint Other- n/a |
Pre-engineered ceiling system for laminar flow areas |
| Class 3-A |
Process- Class A |
Aseptic Processing Lyo Loading/ Unloading |
Floor- Seamless epoxy Walls- GWB w/ high- build epoxy paint Base- Epoxy cove base Ceiling- GWB w/ epoxy paint Other- stainless steel/ acrylic doors at air walls |
Pre-engineered ceiling system for laminar flow areas Maybe use pre-engineered modular wall system |
| Class 4 |
Laboratory |
Quality Control
Lab Microbiology Lab |
Floor- Sheet vinyl Walls- GWB w/ epoxy paint Base- Vinyl cove base Ceiling- CR AC tile Other- n/a |
|
| Class 5 |
Environmental Chamber |
Cold Room Freezer Room Warm Room |
Floor- M panel/ Sheet
vinyl Walls- M panel Base- none Ceiling- eggcrate/ M panel Other- n/aOther- n/a |
Upgrade floor to seamless epoxy |
| Class 6 |
Other/ Specialty |
TBD |
Floor- Walls- Ceiling- Other- |
|
| Non-process Space | ||||
| Classification |
Description |
Examples |
Finishes |
Remarks |
| HVAC
Classifications |
| Gowning
Requirements |
| GMP HVAC Classifications | ||||
| FDA Classification |
ISO Classification |
EU Classification |
Description |
Remarks |
| Unclassified |
N/A |
N/A |
General
Access Unrestricted |
|
| Unclassified |
N/A |
N/A |
Grey Space Mechanical Access |
|
| Controlled Non- Classified |
N/A |
Grade D |
Return Corridor Equipment Wash |
|
| Class 100,000 |
Class 8 |
Grade C |
Process Areas Material Prep Areas |
|
| Class 10,000 |
Class 7 |
Grade B |
Inoculum Lab Final Processing |
|
| Class 100 |
Class 5 |
Grade A |
Bulk Filling Open Process Steps |
|
HEPA Filtered UnidirectionalAirflow |
N/A |
N/A |
Equipment Cool-down |
|